Data inventory
Which tables, files and interfaces exist, who uses them and which systems depend on them.
Move data off legacy systems in a planned, validated way, with a rollback plan.
Ki4data plans and delivers data migrations for mid-sized companies: from inventory through mapping and validation to cutover with a rollback plan. Typical triggers are replacing a legacy database, building a new data warehouse or consolidating several sources. A validation report proves that the data arrived in the target system completely and correctly.
A data migration moves data from an existing system into a new target system, for example from an on-premises database to a cloud data platform. It covers the inventory, field-level mapping of source to target, transformation, checks for completeness and correctness, and the planned cutover.
Last updated:
Which tables, files and interfaces exist, who uses them and which systems depend on them.
Field-level mapping with transformation rules, keys and the handling of legacy data and history.
Repeatable, versioned transfer that can be tested several times before cutover.
Record reconciliations, business metrics and documented deviations as the basis for acceptance.
Sequence, responsibilities, cutover window and criteria for when and how to roll back.
Capture sources, users, interfaces and downstream reports.
Agree target model, mapping and transformation rules with the business.
Migrate a representative slice and measure run times and errors.
Prove completeness and business correctness against agreed criteria.
Switch over in the agreed window, with clear abort and rollback criteria.
Documentation, operational handover and closing open items.
Every project is scoped individually. These factors influence the effort most:
With record reconciliations per object, checksums on key fields and business metrics that must match in source and target. We agree these criteria before migrating, so acceptance is not negotiated after the fact.
That depends on data volume, change rate and the target system. The pilot gives measured run times; from there we plan a cutover window or, where needed, a phased switch with delta loads.
The mapping defines which history is migrated, archived or deliberately left behind. Retention obligations and future reporting needs feed into that decision.
It depends mainly on the number of source systems and how well they are documented, data volume and history, the scope of business validation and the permitted cutover window. After the inventory you receive an estimate that shows these factors instead of a flat price.
In a first conversation we clarify your situation, goals and a sensible starting point. Afterwards you receive an assessment of what a project could look like.
Discuss your migration